THE BRIEF
Northampton A & E were using outside space as a patient waiting area, due to internal building works. With the weather changing, they needed to find a solution to keep patients dry whilst they waited outside.
THE SOLUTION
Having ruled out many solutions because they too much time to set up, Northampton A & E chose the Pro-Tect Curve as it it could be quickly set up outside. With no groundworks or foundations required, this proved a quick solution to their waiting area, providing the protection their patients needed.
Size: 5m x 2m
Product: Curve



